Method
A selection method for property-development bathrooms: types, services, references, finishes, planning and maintenance.
01Structure the room types
Each dwelling type needs a clear layout before finish choices are fixed. Service allowances, axes and finished levels form the coordination base between trades.
- List room types and their variants
- Set axes, finished heights and service allowances
- Identify common elements and exceptions
02Select with a project logic
References should be compared for their fit with the layout, repeatable installation and target finish level. A clear sheet limits uncontrolled substitutions.
- Validate dimensions and installation conditions
- Prepare a reference schedule by room type
- Plan tiling layout before surface orders
03Secure tender and site work
The tender file benefits from separating drawing information, selected references and site checks. This simplifies discussions during supply and handover.
- Share current sheets and drawings
- Schedule checks before closing and finishes
- Archive installed references for after handover