Developer brief

Preparing bathrooms for a property development

For a property development, the right selection remains coherent across drawings, services, finishes, supply and installation. It must be clear to every stakeholder, from costing through handover.

Siège EDIFIS Group à Sidi Daoud

Method

A selection method for property-development bathrooms: types, services, references, finishes, planning and maintenance.

01

Structure the room types

Each dwelling type needs a clear layout before finish choices are fixed. Service allowances, axes and finished levels form the coordination base between trades.

  • List room types and their variants
  • Set axes, finished heights and service allowances
  • Identify common elements and exceptions
02

Select with a project logic

References should be compared for their fit with the layout, repeatable installation and target finish level. A clear sheet limits uncontrolled substitutions.

  • Validate dimensions and installation conditions
  • Prepare a reference schedule by room type
  • Plan tiling layout before surface orders
03

Secure tender and site work

The tender file benefits from separating drawing information, selected references and site checks. This simplifies discussions during supply and handover.

  • Share current sheets and drawings
  • Schedule checks before closing and finishes
  • Archive installed references for after handover

Frequently asked questions

Clarify these points before specification.

01When should references be fixed?

After room types, axes, finished heights and installation constraints have been confirmed, and before ordering.

02How can substitutions be limited?

A reference schedule by room type, supported by current sheets and drawings, makes alternatives easier to control.

03Why archive installed references?

They support maintenance, additions and replacements after handover.