Permanent connections
Pipes and fittings are joined by butt fusion or electrofusion couplings according to site conditions.


Geberit partner in Tunisia since 2005
Technical piping · Geberit PE
HDPE is a strategic EDIFIS capability for buildings, roofs and industrial applications. With Geberit PE, our teams connect pipes, fittings, welded joints, hydraulic constraints, prefabrication and logistics to prepare a coherent project-wide solution.

System overview
Geberit PE is a complete PE-HD drainage system with permanently tight, tensile-resistant welded joints.
Pipes and fittings are joined by butt fusion or electrofusion couplings according to site conditions.
The system can be installed in concrete or in the ground, subject to applicable structural and technical rules.
Sections can be prepared and labelled in a workshop before transport to site.
Diameters from d32 to d315 and a wide range of fittings cover many drainage configurations.
Applications
Sizing, supports, expansion control and any protection must be defined for each project.
Wastewater and soil drainage in residential, hospitality, workplace and commercial buildings.
Conventional drainage or a Geberit Pluvia siphonic system following an appropriate hydraulic design.
Technical applications requiring precise checks of media, temperature and operating conditions.
Installation in concrete or underground with designed fixed points and technical instructions observed.
Pre-assembled units can streamline production, logistics and installation on major projects.
EDIFIS project support
EDIFIS structures technical information, coordinates system selection and helps teams prepare for compliant installation. Final calculations and choices remain subject to approval by the project designers and Geberit requirements.
Review of uses, constraints, interfaces and performance levels to define the relevant scope for Geberit PE, Pluvia, Silent-db20 or SuperTube.
Review of routes, stacks, collectors, openings and special points to identify interfaces requiring coordination or approval.
Preparation of assumptions, proposed diameters and product data; hydraulic calculations and final sizing are approved by the competent design office.
A structured list of pipes, fittings, couplings, supports and tools based on approved drawings and each project phase.
Support in dividing the network into identifiable sub-assemblies, organising prefabrication and sequencing deliveries with site progress.
Access to instructions, preparation guidance and key watchpoints; technical support or product sessions according to the project and available resources.
Essential data
These values describe the system’s general scope and do not replace hydraulic calculations or installation instructions.
!Compatibility must be checked for the exact medium, concentration, temperature and contact duration.
Official d × wall thickness dimensions. Some nominal sizes have two wall thicknesses.
| Nominal diameter (DN) | Dimension d × s (mm) |
|---|---|
| 30 | 32 × 3 |
| 40 | 40 × 3 |
| 50 | 50 × 3 |
| 56 | 56 × 3 |
| 60 | 63 × 3 |
| 70 | 75 × 3 |
| 90 | 90 × 3.5 |
| 100 | 110 × 4.3 |
| 125 | 125 × 4.9 |
| 150 | 160 × 6.2 |
| 200 | 200 × 6.2 / 7.7 |
| 250 | 250 × 7.8 / 9.7 |
| 300 | 315 × 9.8 / 12.2 |
Jointing & installation
The process and tooling depend on diameter, access, prefabrication and site organisation.
Pipe and fitting ends are heated and pressed together to create a homogeneous permanent joint.
Electrofusion is suited to locations where geometry or access makes this method more practical.
Welded sub-units can be prepared, labelled and delivered ready for installation.
Distinguishing the solutions
They can complement one another, but each addresses a specific function and design criteria.
PE-HD pipes and fittings for building and roof drainage and selected industrial applications.
A siphonic roof drainage system designed hydraulically as a complete system.
A separate system optimised for projects with demanding sound-insulation requirements.
A complete drainage-stack solution, notably for high-rise buildings, using specific fittings.
Integrated technical file
The official extract covering Geberit PE and its tooling, together with the environmental declarations, remains available here.
Geberit
For the latest product data, BIM objects and calculations, also use Geberit’s official resources.
Sources & verification
Official sources consulted on 23 July 2026. The exact product sheet, local requirements and availability confirmed for the project remain decisive.
Your technical network
Send drawings, intended diameters, uses and constraints. EDIFIS helps organise the selection and required checks.