Decide methodically before ordering. — EDIFIS

Advice & guides

Decide methodically before ordering.

Practical guidance to ask the right questions, prepare interfaces and find useful documents. Final data remains subject to manufacturer documents and the project design.

WC frame before cladding
01

Choose a WC frame for the wall type

Masonry, drywall and pre-wall installations transfer loads differently. Start with the structure, then available height and depth.

Method

  1. Identify wall type and thickness
  2. Locate load-bearing floor, fixings and waste
  3. Set bowl height and plate position
  4. Check cistern–plate–bowl compatibility
  5. Plan cladding while retaining service access
WC technical element before closing
02

Seven checks before closing the WC wall

Once closed, errors in axis, depth or watertightness are expensive. Record an intermediate inspection.

Method

  1. Check level, plumb, axis and finished height
  2. Tighten fixings to instructions
  3. Test supply, stop valve and connections
  4. Run several flushes and check waste
  5. Confirm sleeves, rods and protections
  6. Photograph services before closing
  7. Keep cistern reference and instructions
Mixers installed on basins
03

Match a basin mixer to the bowl

Tap height alone is not enough. Jet position, bowl slope, rim distance and control clearance determine comfort and splashing.

Method

  1. Record bowl height, width and depth
  2. Locate tap hole and waste
  3. Compare actual spout height and reach
  4. Check jet reaches the useful zone
  5. Keep control and cleaning access
  6. Confirm hoses, valves and overflow
Real shower space
04

Exposed or concealed shower: decide early

Concealed systems free the visual space but need coordination, depth and access before tiling. Exposed systems often simplify replacement.

Method

  1. List head, hand shower, spout and outlets
  2. Measure dynamic pressure and simultaneous flow
  3. Check hot-water production
  4. Reserve depth and wall penetrations
  5. Define waterproofing, falls and drain
  6. Keep base-body and trim references
Large porcelain-stoneware surfaces
05

Choose porcelain stoneware by use

Material effect and colour follow context: indoor or outdoor, water, traffic, light, care, substrate and installation.

Method

  1. Define area, traffic, moisture and exposure
  2. Check exact-reference slip and performance data
  3. Match format to space, flatness and handling
  4. View a sample under project lighting
  5. Plan layout, joints, cuts and allowance
  6. Control shade, calibre and batch when ordering
Technical HDPE pipework
06

Geberit PE, Pluvia, Silent-db20 or SuperTube?

The names are not interchangeable: conventional drainage, siphonic rainwater, acoustic performance or stack optimisation address different needs.

Method

  1. Define soil, waste and rainwater context
  2. Have flows and networks professionally sized
  3. Select by hydraulics, acoustics and space
  4. Use the system's fittings, joints and supports
  5. Plan prefabrication, welding and joint checks
  6. Archive drawings, tests and maintenance data

Sources & verification

Technical information you can trace.

Official sources consulted on 23 July 2026. The exact product sheet, local requirements and availability confirmed for the project remain decisive.

Advice & guides

Decide methodically before ordering.

Practical guidance to ask the right questions, prepare interfaces and find useful documents. Final data remains subject to manufacturer documents and the project design.