Practical guide · 5-minute read

Choose a WC frame for the wall type

Masonry, drywall and pre-wall installations transfer loads differently. Start with the structure, then available height and depth.

WC frame before cladding
Since 2005Geberit partner in Tunisia
Since 2016hansgrohe and AXOR partners in Tunisia
Since 2023Deante partner in Tunisia
600 m²to view and compare at the Flagship Store
In Tunistechnical advice, documentation and local service

Essential checks

  1. 01

    Identify wall type and thickness

  2. 02

    Locate load-bearing floor, fixings and waste

  3. 03

    Set bowl height and plate position

  4. 04

    Check cistern–plate–bowl compatibility

  5. 05

    Plan cladding while retaining service access

Do not overlook

A self-supporting frame still requires slab, anchoring and manufacturer instructions to be checked.

A documented decision

Keep product sheets, instructions, concealed-part references and photographs before closing. They simplify installation, inspection and later service.

Sources & verification

Technical information you can trace.

Official sources consulted on 23 July 2026. The exact product sheet, local requirements and availability confirmed for the project remain decisive.