Essential checks
- 01
Check level, plumb, axis and finished height
- 02
Tighten fixings to instructions
- 03
Test supply, stop valve and connections
- 04
Run several flushes and check waste
- 05
Confirm sleeves, rods and protections
- 06
Photograph services before closing
- 07
Keep cistern reference and instructions
Measure from finished-floor level, not only from a drawing dimension.
A documented decision
Keep product sheets, instructions, concealed-part references and photographs before closing. They simplify installation, inspection and later service.